Installation of a MobyDick ConLine KIT Plus 800 B-50P in Huglfing, Upper Bavaria

In the course of the construction project Kramertunnel in Bavaria, the company Herrmann Albrecht Hoch- und Tiefbau GmbH decided to install a MobyDick Wheel Washing System. From now on, the wheels and chassis of more than 100 trucks can be cleaned per day, in order to minimize the road pollution caused by the transport of the excavated material. The planned single-tube tunnel with two lanes and a length of 3577 m will be the third longest road tunnel in Germany after its completion. The aim of the project is to increase the capacity of the supra-regional north-south connection between Munich and Fernpass (Austria – Tyrol) and to relieve the city centre of Garmisch. The opening of the tunnel is planned for 2024.

Albrecht3

MobyDick ConLine KIT Plus 800 B-50P

Albrecht2

MobyDick ConLine KIT Plus 800 B-50P

Wheel Wash Wheel Washing - ConLine KIT Flex Wheel Washing - ConLine KIT Plus Wheel Washing - TailorMade Line Demucking Demucking - Construction Equipment Demucking - Rail Vehicles Demucking - Military Vehicles Dust Control Dust Control - Cannon Line Dust Control - TailorMade Line